船舶 ›› 2019, Vol. 30 ›› Issue (03): 64-70.DOI: 10.19423/j.cnki.31-1561/u.2019.03.064
• 船舶动力装置 • 上一篇 下一篇
李康康, 王乐, 吴磊
收稿日期:
修回日期:
出版日期:
发布日期:
作者简介:
LI Kang-kang, Wang-le, Wu Lei
Received:
Revised:
Online:
Published:
摘要: 动力定位等级分别为DP-1和DP-2的风电安装船。其冷却水系统设计有较大差别。文章介绍1 200 t自升自航式风电安装船的冷却水系统用户,分析不同工况下各冷却水系统用户的运行情况;为满足各工况下各用户对冷却水的需求,对该船型动力定位等级为DP-1和DP-2时的冷却水系统分别进行设计计算。
关键词: 风电安装船, 动力定位, 冷却水系统
Abstract: The design of the cooling water system on wind turbine service unit with DP-1 and DP-2 dynamic positioning grades is quite different. This paper introduces the cooling water system on a 1 200 t self-elevating and self-propelled wind turbine service unit, and analyzes the running situations of the cooling water system under the different operation conditions. In order to meet the requirements of the cooling water under the different operation conditions, the cooling water systems of the ship with DP-1 and DP-2 dynamic positioning grades are designed and calculated respectively.
Key words: wind turbine service unit, dynamic positioning, cooling water system
中图分类号:
U664.81+4
李康康, 王乐, 吴磊. 动力定位风电安装船冷却水系统设计[J]. 船舶, 2019, 30(03): 64-70.
LI Kang-kang, Wang-le, Wu Lei. Design of Cooling Water System on Dynamic Positioning Wind Turbine Service Unit[J]. Ship & Boat, 2019, 30(03): 64-70.
0 / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://chuanbo.magtechjournal.com/CN/10.19423/j.cnki.31-1561/u.2019.03.064
http://chuanbo.magtechjournal.com/CN/Y2019/V30/I03/64