Ship & Boat ›› 2019, Vol. 30 ›› Issue (06): 83-88.DOI: 10.19423/j.cnki.31-1561/u.2019.06.083

Previous Articles     Next Articles

Brief Analysis of Electrical Design of Pipelaying Crane Vessel Meeting Requirements of Safe Return to Port

SUN Lei1, LIANG Rong2, ZHU Hui-yu1, LAN Wen-hao1   

  1. 1. Marine Design & Research Institute of China, Shanghai 200011, China;
    2. Guangzhou Salvage Bureau of the Ministry of Transport, Guangzhou 510260, China
  • Received:2019-07-20 Revised:2019-08-08 Online:2019-12-25 Published:2020-03-07

满足安全返港要求的起重铺管船电气设计浅析

孙蕾1, 梁荣2, 朱晖宇1, 蓝文昊1   

  1. 1.中国船舶及海洋工程设计研究院 上海200011;
    2.交通运输部广州打捞局 广州510260
  • 作者简介:孙 蕾(1980-),男,本科,工程师。研究方向:船舶电气设计。梁 荣(1963-),男,大专,工程师。研究方向:船舶电气设计。朱晖宇(1993-),男,本科,助理工程师。研究方向:船舶电气设计。蓝文昊(1989-),男,硕士,助理工程师。研究方向:船舶电气设计。

Abstract: A large number of crew will work and live on board for many large special purpose vessels with the continuous exploration of ocean, which will put forward higher and higher requirements for the ship safety. In general, safe return to port is for passenger ships, and there are few engineering ships can meet this requirement. This paper introduces the design method of the electrical system and its influence on the design of the electrical system for a deepwater pipe-laying crane vessel that meets the requirement of safe return to port. It can provide reference for the design of the similar ships in the future.

Key words: pipe-laying crane vessel, electrical design, safe return to port

摘要: 随着人们对海洋的不断开发,许多大型特种用途船舶在作业时会有大量工作人员在船上工作、生活,这就对船舶安全性提出了越来越高的要求。通常“安全返港”是对客船而言,满足此要求的工程船案例较少。该文以某型满足“安全返港”要求深水起重铺管船为例,介绍了电力系统设计方法及对电气系统设计的影响,为今后类似船的设计提供参考。

关键词: 起重铺管船, 电力系统设计, 安全返港

CLC Number: